• Home
  • Metallurgy Project Solution

Lead-tin Recovery Project

The lead-tin recovery project is design to extract the tin metal from the lead-tin alloy(Pb-Sn Alloy) or lead-tin-antimony alloy(Pb-Sn-Sb alloy), which are the slag from the crude lead refining or lead acid battery recovery. The lead-tin-antimony is the core metallurgy equipment of the project.

Read More

Cadmium Refining Project Solution

This Cadmium refining project is design to extract the cadmium (Cd) from the sponge cadmium (sponge Cd), which is the residual from the zinc (Zn) refining. There are two stages for refining Cd. At first stage, it briquettes and reduces sponge Cd to produce the crude cadmium(98~99% Cd); at second one, the crude Cd is refined by using cadmium vacuum distillation furnace.

Read More

Indium Refining Project

This indium refining project is design to extract the Indium (In) from the sponge indium (sponge In), which is the residual from the zinc (Zn) refining. There are two stages for refining In. At first stage, it reduces sponge In to produce the crude Indium (95~96% Cd); at second one, the crude Cd is refined by using Indium vacuum distillation furnace.

Read More